CCUS Technology

ccus

1. Carbon Capture Systems

a) Post-Combustion (Flue Gas)
  • Solvent-Based (MEA/DEEA)
  • Capacity: 10-5,000 TPD CO₂
  • Purity: ≥ 99.5% CO₂
  • Yuanhan's low-energy solvent regeneration
  • Teamwin's corrosion-resistant absorber towers (2205 duplex SS)
b) Pre-Combustion (Syngas)
  • Pressure Swing Adsorption (PSA)
  • CO₂ recovery rate: 85-95%
  • Integration with SMR/gasification
  • Yuanhan's low-energy solvent regeneration
  • Teamwin's corrosion-resistant absorber towers (2205 duplex SS)
c) Oxy-Fuel Combustion
  • Partnership with Yuanhan's OECS systems for high-concentration CO₂ streams

2.CO₂ Purification & Compression

Component

Teamwin Contribution

Yuanhan Innovation

Dehydration

3-bed molecular sieve units

Advanced TEG (≤ 50 ppm H₂O)

Compression

4-stage reciprocating compressors (up to 150 bar)

Waste heat recovery turbochargers

Liquefaction

Cryogenic chillers (-40°C)

Cascade refrigeration cycle

Output Specifications:

  • Food-grade CO₂ (99.9%)
  • EOR-ready supercritical CO₂ (>73 bar, 31°C)

3. Utilization & Storage Solutions

a) Utilization Pathways
  • Enhanced Oil Recovery (EOR)
  • Injection purity: ≥ 95% CO₂
  • Yuanhan's mobile CO₂ conditioning skids
  • Chemical Feedstock
  • Urea synthesis (Teamwin's high-pressure reactors)
  • Algae cultivation (integrated photobioreactors)
b) Geological Storage
  • Wellhead equipment (Teamwin)
  • Monitoring systems (Yuanhan's seismic+AI leak detection)

3. CCUS Plant Configurations

Model

Capture Capacity

Technology

Footprint

Target Industries

CCUS-100

100 TPD

Post-combustion MEA

800 m²

Cement, Power

CCUS-500

500 TPD

Oxy-fuel + cryo

2,000 m²

Steel, Refineries

CCUS-2000

2,000 TPD

Pre-combustion PSA

5,000 m²

Petrochemicals

Compliance: ISO 27916, EU ETS, China GB 36660

Partner Strengths Integration

Phase

Teamwin Role

Yuanhan Role

Greenox Value

Engineering

Modular plant design

Process simulation

Site-specific adaptation

Fabrication

ASME vessels/piping

Energy optimizer

QA/QC oversight

Operation

Maintenance training

AI performance monitoring

Remote support

Featured Innovation:

  • Yuanhan's "3D-Capture" solvent (40% lower degradation vs MEA)
  • Teamwin's stackable capture modules for phased deployment

Project Economics

Metric

Conventional

Greenox CCUS

Improvement

Capex ($/TPD)

$1.2M

$900K

25% ↓

OpEx ($/ton)

$60

$42

30% ↓

Energy Penalty

35% of plant output

22%

37% ↓

Financial Models:

  • Carbon credit monetization
  • Build-Own-Operate (BOO) options

Why Partner with Greenox?

  • Complete Value Chain – Capture to storage/use
  • Proven Tech – 12 operational plants (50,000+ TPA total)
  • Regulatory Ready – MRV-compliant reporting
  • CO₂ Offtake Agreements – Through energy partners

Key Differentiators

  • Teamwin's modular approach cuts installation time by 40%
  • Yuanhan's machine learning optimizes solvent regeneration
  • Greenox's turnkey service covers permits to commissioning

CCUS Technology